Fellowship Hall/Kitchen Floor Project Radiator covers getting cleaned before painting Moving chairs and tables out of the Fellowship Hall Moving chairs and tables out of the Fellowship Hall Moving chairs and tables out of the Fellowship Hall Moving chairs and tables out of the Fellowship Hall Carpet removed from choir storage room Folding rug from choir/storage room Taking rug out to the dumpster Dumpster getting overloaded There was a little room left . . . Empty kitchen Empty kitchen Empty kitchen Empty kitchen The stage is loaded with stuff Empty closets in the Fellowship Hall Empty closets in the Fellowship Hall Empty Fellowship Hall – showing some of the loose tile Empty Fellowship Hall Temporary storage area in the education wing Temporary storage area in the education wing Temporary storage area The abatement contractors put up this sign Kitchen Doors leading to narthex Door leading to Fireside Room Looking toward the stage Choir room Choir room Fellowship Hall – tile removed – 10.29.2016 Kitchen – tile removed – 10.29.2016 Kitchen – tile removed – 10.29.2016 Fellowship Hall – tile removed – 10.29.2016 Back Entry – tile removed – 10.29.2016 Choir Storage Room – tile removed – 10.29.2016 Cleaning the baseboard heat covers before painting them Freshly painted radiator covers installed Floor prepped for tile installation – 11/07/16 Floor prepped, tile ready to be installed 11/07/16 Floor prepped for installation of tile 11/07/16 Workers spreading glue and laying tile – 11/9/16 11/9/16 11/9/16 11/10/16 11/10/16 Tables being returned to the Fellowship Hall – 11/12/2016 Each table was turned upside-down so new ends could be put on the table legs to protect the floor. Installing the floor-protectors on the table legs Re-installing the radiator covers – 11/12/2016 Cleaning a spot on the wall