Fellowship Hall/Kitchen Floor Project

 

img_2715

Fellowship Hall – tile removed – 10.29.2016

img_7060

Kitchen – tile removed – 10.29.2016

img_2749

Kitchen – tile removed – 10.29.2016

img_0854

Fellowship Hall – tile removed – 10.29.2016

img_4002

Back Entry – tile removed – 10.29.2016

img_9794

Choir Storage Room – tile removed – 10.29.2016

img_7668

Cleaning the baseboard heat covers before painting them

img_2690

img_7323

Freshly painted radiator covers installed

img_7321

Floor prepped for tile installation – 11/07/16

img_7319

Floor prepped, tile ready to be installed 11/07/16

img_7322

Floor prepped for installation of tile 11/07/16

img_7326

Workers spreading glue and laying tile – 11/9/16

img_7327

11/9/16

img_7328

11/9/16

img_7329

11/10/16

img_7330

11/10/16

img_7331

Tables being returned to the Fellowship Hall – 11/12/2016

img_7332

img_7334

Each table was turned upside-down so new ends could be put on the table legs to protect the floor.

img_7335

Installing the floor-protectors on the table legs

img_7336

img_7337

img_7338

Re-installing the radiator covers – 11/12/2016

img_7340

img_7342

img_7345

Cleaning a spot on the wall